Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My votes: Power Systems Design

Showing 17
147 VOTE

Concurrent Maintenance for Ethernet adapter component SFP - FRU for SFP request

Please provide concurrent maintenance using own FRU = Field Replaceable Unit number for adapter component SFP for ethernet adapter EN0J, EL38, EN0H, EL56, CCIN for all is 2B93, vendor Emulex / Broadcom. Currently a FRU number is available for whol...
about 4 years ago in Power Systems Design 7 Not under consideration

InfiniBand adapters for Power10 based hardware

Customers are asking for a higher performance networking option than is currently available from the existing RoCE-capable 100 Gbps Ethernet adapters on Power10 based server models. Based on the performance seen with POWER9 based servers, they exp...
about 2 years ago in Power Systems Design 3 Not under consideration

Concurrent replacement for the FSP

The FSP (Flexible Service Processor) cannot be changed in Concurrent mode. The E870C and E880C Systems have a dual FSP configuration, the failover of a FSP System does not create an outage.But the replacement of the failed FSP must be done after o...
over 6 years ago in Power Systems Design 3 Not under consideration

AC922 - BMC-GUI usable in HMC-GUI

make usage of BMC-GUI possible like we know from cassical-FSP Power-machines ( ASMI )
almost 4 years ago in Power Systems Design 0 Not under consideration

New Product of Data Processing Unit DPU based on IBM Power 11 (or later Power processors) with Nvidia GPUs for the future Applications

Building a new product of IBM and Nvidia Data Processing Unit, the suggested DPU may have the following description and capabilities: 1- Using IBM Power 11 instead of Intel Xeon or ARM will make the software licenses and the cyber security more ad...
over 1 year ago in Power Systems Design 1 Not under consideration

Add Internal LTO Tape drive to Next generation of Power System

Add internal LTO Tape drive to next generation of IBM POWER Servers. Especially the P05 class machine.
almost 6 years ago in Power Systems Design 5 Not under consideration

Evaluate if Nutanix on Power Systems is valid (again) with new workloads

Nutainx runs quite many areas inside companies, like VDI but also databases and plain app-vms. In this scenario also offering Power Systems as HW nodes might make the usage of Power Systems easier for customers to implement/use for Linux and AIX.
over 2 years ago in Power Systems Design 1 Not under consideration

We suggest new Product of Nvidia DGX based on IBM Power11 or later processors with Nvidia GPUs based on CXL 3.0 or CXL 4.0

The future High performance Computing can be either Centralized (Cloud) or Distributed or Hybrid, therefore we need to take into consideration the Quantum Safe Cryptography, IBM Power 11 or later Power processors have this capability, also it will...
over 1 year ago in Power Systems Design 1 Not under consideration

Blocking ?UAK expired events log? call out for Customer China Unionpay

Customer China unionpay has over 100 9119-MME E870 system running production, the UAK expired events log call out every 180 days for every single E870 system. For the over 100 system, customer have to update UAK new license with very high frequenc...
almost 5 years ago in Power Systems Design 1 Not under consideration

Finally leverage "the mainframe lesson" and fully exploit NUMA in POWERsystems

Why run VIO servers in the same cores, DIMMs, buses, etc. as all your real workloads? Instead of a 2-socket / 2 NUMA domain system, sell us an asymmetric 4-socket / 4 NUMA domain system where 2 of the sockets / domains are much smaller and contain...
about 2 years ago in Power Systems Design 3 Not under consideration