Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 1563

LPM network interface option

During initial LPM (Powervm 2.2.5.10) The 'mover' presents several network interfaces to choose from. These interfaces have been test with a PING, (tested by LPM not user ) and PING have tested as affirmative. LPM assumes that network interface is...
over 7 years ago in PowerVM VIOS 1 Future consideration

Cross Frames Shared Processor Pool via PEP

- Today PEP2.0 delivers capability to allow flexible usage of system resources (core, ram, OS) across frames. - Client evaluating PEP2.0 have expressed concern that with PEP induced flexibility, they lose control over DB/App software license usage...
over 3 years ago in Cloud Management Console 1 Future consideration

Change the 1 or all storage port zoning option to Interger or all storage ports

Change the 1 or all storage port zoning option to Interger or all storage ports, this would allow you to set the number of storage target ports allowing for a more flexible zoning policy that can better consume the storage array's front end ports.
over 5 years ago in PowerVC 1 Future consideration

PowerVC HA Seamless Failover and Back

A mechanism /support for PowerVC HA at a minimum to include a mechanism in the current active -passive HA deployment model to clean up the old/failed PowerVC. Please refer to Divya K Konoor.
over 5 years ago in PowerVC 1 Future consideration

PowerVC Support for Centrify AD Users

After upgrading to PowerVC 1.3.2 we have experienced that any new users added to openstack were no longer available to use PowerVC. I think that this might have something to do with an addition of powervc-filter group https://www.ibm.com/support/k...
over 7 years ago in PowerVC 2 Future consideration

Problem whit the discs paramitters on AIX 7.2 TL5 SP2

we have found that upgrading to AIX 7.2 TL5 SP2 changes the disk policies. We think that this is a big problem, because we manage hundreds of servers, and if we change the reserve_policy with chdev, then every time a technician adds a disks to a c...
almost 4 years ago in AIX 0 Future consideration

Allow the Novalink partition to perform LPM operations

Currently LPM operations in PowerVC are performed via the GUI. Using this method also allows you to select which network (from the ones configured/available) that the operations occurs on. I think that this feature should be either via a command o...
over 5 years ago in PowerVM NovaLink 1 Future consideration

ARE sync PTF Coverletters when available

Always sync PTF coverletters when doing a PTF sync with ARE Use Case: When doing a PTF sync from an image catalog with PTF iso images PTF coverletters are transferred to the target system from the CS. When instead of an image catalog PTF savefiles...
over 5 years ago in IBM i / System Management 4 Future consideration

Host Service Should Ignore Expired Certificates

Today I experienced that as long as an expired certificate exists, the associated services on power i (e.g. login, database, ddm) do not work and deny access despite the fact there is another certificate that is active on the same services. By del...
almost 2 years ago in IBM i / Security 2 Future consideration

Allow multi-volume select for storage resizing operation

It is common for users to have multiple storage volumes attached for databases or other workloads to support both throughput or capacity needs. When storage volume sizes need to be increased it is much faster and safer to allow selection of all th...
almost 2 years ago in PowerVC 1 Future consideration