Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 4752 of 4752

i Access for Windows for Vietnamese Language

Currently, i Access for Window is only allowed to input Vietnamese language using the Windows keyboard setting which is VNI method. This method is not commonly used in Vietnam as it used combination of numeric and symbol for Vietnamese accent. It ...
almost 7 years ago in IBM i / IBM i Access Family 1 Not under consideration

Allow LPAR ID modification during Novalink Recovery partition data process

The current Novalink recovery process has been created to accommodate the recovery of a physical server from a Novalink only managed deployment and greenfield clients who are fine with not implementing internal standards. This recovery process is ...
almost 7 years ago in PowerVM NovaLink 2 Future consideration

PowerVC - zone update to CISCO switches

Customer would like zone updates to cisco switches to be staggered and delayed.PowerVC when creating zones for storage will force a zone update, On Cisco switches that may cause an outage to all storage impacted by the zone.The customer has redund...
about 7 years ago in PowerVC 1 Future consideration

Screen Designer droping a reconrd in a Window should include window keyword referencing the existing window

When buiding a window that contains a subfile, we typically have at least three record formats: the subfile, the control and another one for the keys at the bottom. So using the Design Screen mode we would- create a new screen- drag a subfile reco...
about 14 years ago in IBM i / RDi (Rational Developer for i) 4 Not under consideration

SNMP Storage OID 32bit limitation on greater than 16 TB

SNMP OID not showing correct information due to limitation of being a 32bit integer var.hrStorageSize.15 = 421265408
about 7 years ago in AIX 1 Not under consideration

IFS includes not added to outline and content assist

LPEX editor/outline/content assist: If an include from the IFS is included into a source code/program then its content is not included into the information of the outline and is not accessible through content assist (ctrl+space), even when I speci...
over 14 years ago in IBM i / RDi (Rational Developer for i) 6 Not under consideration

Enhanced Compare Selection Interface

The ability to show a comparison between two or three members is a very handy feature but the ability to select the member to compare to is cumbersome/time consuming. To select the member, either you have to have the library in the list or specify...
over 14 years ago in IBM i / RDi (Rational Developer for i) 4 Not under consideration

Include line not colored correctly

If I include a copy book from the IFS and the path is longer that position 50 the color coding doesn't work. Everything after position 50 is colored differently. Use Case: /include '/usr/local/include/json/json_h.rpgle'
over 14 years ago in IBM i / RDi (Rational Developer for i) 3 Is a defect

Netboot Disk selection tool

We have disk system over 2000.When perform network booting.Many time spend for disk selection.When Disk selection menu, 6-next,6-next......We want keyword search tool .
about 7 years ago in AIX 2 Not under consideration

PowerVC support for Brocade LSAN (FC routing)

Within IKEA cloud (and automation) track there are systems (VM´s) that use storage from 2 different sites (different clusters). Today LSAN is configured for achieving this.
about 7 years ago in PowerVC 1 Future consideration