Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 4924 of 4924

Adjustable columns in HMC table view

Please consider individual configuration of table view of LPARs for each HMC user bya) allow removal of columns without interest inb) smaller column width (maybe shorter texts. In German "Partitions-ID" might be shortened by "ID")c) other example:...
almost 6 years ago in Hardware Management Console 3 Future consideration

Remove temporary files from data directory after creating AFP resource through AFP Manager in Navigator for i

When creating an AFP resource using AFP Manager in Navigator for i, the temporary file used to create the resource on the IBM i is stored in the/QIBM/UserData/OS400/Navigator/config/data directory. The temporary files are not cleared after the AFP...
over 4 years ago in IBM i / System Management 3 Future consideration

ACS update to include built in token acceptance for Oauth or Open ID connect

See case TS013914045 for background
about 2 years ago in IBM i / IBM i Access Family 2 Not under consideration

CMC Cloud connector stale HMC alerting

Right now, there is no alerting possible for stale HMC's cloud connector status from CMC. Would be great to have possibility receive notification about stale HMC's.
over 2 years ago in Cloud Management Console 1 Submitted

Add SIRGAS 2000 as supported datum on DB2 for i

Since 2005, Brazil has adopted datum SIRGAS 2000 as its official Georeferencing System. Therefore, all information exchanged between government entities must adhere to this standard. It is also used by other Latin American countries. Thus, it woul...
9 months ago in IBM i / Db2 for i 2 Not under consideration

Add the option to change 5250 color's when using command line switches

When using command line switches to automate 5250 sessions it would be great to be able to change the text color in the 5250 session. This removed the need to have a .HOD file and if a user saves a hod file it is ignored as the new session is buil...
9 months ago in IBM i / IBM i Access Family 1 Not under consideration

Select Project at login screen

Rather than "Change Project" after logging in with a user that is authorized to multiple projects, a drop-down selection at the login screen would be a nice feature.
over 7 years ago in PowerVC 3 Not under consideration

wrkjobscde table

Hi IBMer, In order for us to process the wrkjobscde table, we have to output to a spool file, then feed it in into a program, etc which is rather awkward. Would you be kind to please provide a facility for us to query the table entries of workjobs...
over 7 years ago in IBM i / Work Management and Messaging 3 Not under consideration

Make HMC permissions with clearer delineations and documentation

Task role permissions remain difficult to properly distinguish and divide in the enhanced interface(documented by IBM as also being more difficult than classic interface). Task permissions should be distinct and well defined based on likely use of...
over 5 years ago in Hardware Management Console 2 Planned for future release

Adding more than one Fabric to PowerVC when the Fabrics are merged

Situation: I have 4 brocade san fabrics. SASGSRFC07 SASGSRFC08 SASFX05 SASFX06 There is a ISL link between them. I have registered SASFX05 and SASFX06 successfully with PowerVC, but I am unable to register SASGSRFC07 and SASGSRFC08. The message I ...
over 1 year ago in PowerVC 1 Future consideration