Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

VM Recovery Manager

Showing 46

The ksysrppmgr command should be able to adjust the available resources on the managed hosts using the current HMC (V8R8.5.0 and later) POWER® Enterprise Pool capability.

The command currently can only adjust the available memory and processors on a managed system by referencing the HMC and the system it manages. This presents a challenge for adjusting the available resources on the remote managed systems when the ...
about 2 years ago in VM Recovery Manager 1 Future consideration

Move the VLAN management from the host_group to the workgroup for more granular management. Away to have a backup of th

We have multiple VLANs in our PROD site, but a single VLAN in DR if the VLAN management was moved to the workgroup level it would be easier to manage the VLANs by creating a workgroup for each VLAN in PROD and mapping the VLAN for the workgroup to...
about 3 years ago in VM Recovery Manager 1 Planned for future release

shared dual-cec configuration

Let's take this scenario: we have two datacenters, each one has the same number of POWER servers managed by VMRM. We have two KSYS consoles - one in each datacenter. Basic idea is, when 1 DC acts as primary, while 2nd as standby. I'd like to have ...
about 4 years ago in VM Recovery Manager 2 Future consideration

Display current phase for each workgroup in the GUI

In the GUI, display the current phase of every workgroup for both "Rehearsal Phase" and "Move Phase". More workgroups can add more confusion about which workgroup is in which phase during testing or real DRs. It would be helpful if the GUI were al...
over 1 year ago in VM Recovery Manager 0 Submitted

Unmanage port in VM Recovery Manager

A customer is hitting an issue that we have seen a few times with customers. Discover / verify operation fails with the following error when issuing an inquiry command:migmgr -f get_adapter -t vscsi -s U9080.M9S.21D5C47-V2-C418 -w 1385770584273256...
over 3 years ago in VM Recovery Manager 0 Planned for future release

Enhance GUI "view details" information

The "view details" button available in the "Events" window should show useful information or better point to the real problem rather than provide generic information.
almost 3 years ago in VM Recovery Manager 0 Future consideration

Clearer error message when not enough resources at remote site

Make the resulting error clearer about not having sufficient resources at the remote site to host all the local VMs.
almost 3 years ago in VM Recovery Manager 0 Planned for future release

Replace Bull Frewware RPMs with IBM Open Source repository RPMs for VM Recovery Manager

It would be much better for this product to use RPMs from IBM's own RPM repository, as managed by yum rather than using a third party RPM repo. Companies that standardize on using the RPMs from IBM's repo must uninstall them to utilize the RPMs fr...
over 5 years ago in VM Recovery Manager 1 Planned for future release

Have GUI display, monitor, and report the RCCG names and states

Add a current status of the remote copy consistency groups to the GUI. VMRMDR sets up the VMRDG_6_ksysclu RCCG but does not display them in the GUI. If one gets of the RCCGs gets out of the “consistent_synchronized” state, then the customer tries ...
over 1 year ago in VM Recovery Manager 0 Submitted

VMRM DR - move fails although verification works

Case TS004589009:Before we move our LPARS into backup location using VMRM DR, we run 'ksysmgr verify' to make sure there will not be any issues during move. Although "verify" process reports success, real move fails on insufficient resources.
about 4 years ago in VM Recovery Manager 0 Future consideration