Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

PowerVM

Showing 40

LPM Fails On Systems With Non-Functional Physical Adapter Ports

When attempting to use Live Partition Mobility (LPM) to move a logical partition (LPAR) from one system to another, source partition virtual to physical connectivity is first validated before executing the migration. Unfortunately, this negates th...
about 4 years ago in PowerVM 1 Not under consideration

Develop health check procedure to automate validation SEA and switch VLAN trunk configuration matches

Using VLANs on Power Systems usually comes with Virtual Ethernet Adapters bridged to hypervisor switch and SEA Failover/Sharing setup.The maximum configuration can be 16 Virtual Ethernet Adapters and maximum 20 VLANS + PVID / SEA, so 336 VLANs in ...
about 7 years ago in PowerVM 1 Not under consideration

Be sure a CPU a device is attached to is present in the LPAR

When a device is attached to a LPAR, there is no guarantee that the CPU this device is attached to will be part of the LPAR. This leads to device with no specific numa node, confusing script managing irqbalancing like the Mellanox one and probably...
over 4 years ago in PowerVM 1 Not under consideration

UAK Longer validated period

We want to have UAK validated period extended to 1 year at least. Currently implemented period of 180 days is considered too short. When system attention lamp turns on at UAK expiration, customers are forced to take reactive actions to decide if a...
almost 7 years ago in PowerVM 2 Not under consideration

Shared Ethernet Adapter Linux effects

Based on Steven Knudson TechDoc "Ethernet on POWER: Physical, Shared, Virtual" Document ID: PRS5353 with SLES11 and my own virtual ethernet performance tests with SLES12 it is not possible to hit > 23Gb/sec. (SLES12 --> hypervisor --> SLE...
over 5 years ago in PowerVM 1 Not under consideration

Be sure a CPU a device is attached to is present in the LPAR

When a device is attached to a LPAR, there is no guarantee that the CPU this device is attached to will be part of the LPAR. This leads to device with no specific numa node, confusing script managing irqbalancing like the Mellanox one and probably...
almost 6 years ago in PowerVM 1 Not under consideration

Creating virtual ports as a way to bypass physical port level validation

Live Partition Mobility for NPIV clients requires that both (active and inactive) WWPNs for each virtual Fibre Channel adapter must have been zoned to the exact same storage port WWN on the switch/SAN and must have been defined to the storage arra...
almost 6 years ago in PowerVM 0 Not under consideration

Novalink appliance

Novalink has a dependency on Linux on POWER.Our firm does not use Linux on POWER and therefore introduction of a new OS platform will be a barrier to adoption of Novalink. Novalink as an appliance would remove this barrier.
almost 7 years ago in PowerVM 1 Not under consideration

ibmveth

followup 131910:modinfo ibmveth filename: /lib/modules/4.12.14-95.24-default/kernel/drivers/net/ethernet/ibm/ibmveth.koversion: 1.06license: GPLdescription: IBM Power Virtual Ethernet Driverauthor: Santiago Leon <santil@linux.vnet.ibm.com>++...
over 5 years ago in PowerVM 1 Not under consideration

New Firmware Update Access Key (UAK) need to be order and are issued with a duration of 180 days

N1022509 - A7004761 Order and Apply Firmware Update Access Key (UAK) IBMi OS Managed or HMC Managed POWER8 or POWER9 Systemshttps://www-01.ibm.com/support/docview.wss?uid=nas8N1022509It told -- Therefore, new Update Access Key(s) need to be order ...
almost 6 years ago in PowerVM 0 Not under consideration