Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas: PowerVM

Showing 40 of 4449

HMC to use Novalink to proxy/relay RMC connections for AIX & Linux

In a PowerVC Novalink environment where, for security or other reasons a direct RMC connection between the HMC and AIX/Linux is not allowed, it would be advantageous if the Novalink partitions could act as a proxy/relay for RMC connectivity betwee...
29 days ago in PowerVM 0 Submitted

Enable Shared Processor Pool within PEP 2.0

In the current implementation of PEP 2.0, the processor resources available in operation are composed of the respective Base Activations per machine and the additional credits. The limit of the usable resources corresponds to the total installed p...
almost 2 years ago in PowerVM 1 Not under consideration

LPM exchanges vNIC servicing VIOS every time

We are using two power systems with vNIC virtualisation. Because we want to know which vios is using which ethernet adapter we select vio1 for servicing vNICs running on adapter cards c1 and c2 and vio2 for servicing adapter cards c8 and c9 (examp...
9 months ago in PowerVM 0 Submitted

Low latency interpartion communication on Power.

Idea is about improvement of inter-partition communication on Power. As a part of our internal PoC project we have been reqested to measure latency between virtual lpars running on one hardware ( POWER 9) and compare results with results between v...
over 1 year ago in PowerVM 1 Future consideration

Implement a virtual SAN switch in the PHYP

Instead of passing a virtual WWN via NPIV, implement a virtual SAN switch and use the the VIOS FC adapters for ISLs. This would simplify the LPAR configurations (only one VFC per fabric, while preserving the redundancy vis-a-vis a VIOS failure/res...
over 1 year ago in PowerVM 0 Future consideration

Guard off VIOS when RMC get locked

Allow Migration with Inactive Source Storage VIOS is default on to be able to do LPM when one VIOS is out of order.If you do SAN path adjustment on VIOS side using vSCSI backed devices VIOS will get blocked.viosbr is not running anymore.MS get loc...
almost 3 years ago in PowerVM 1 Not under consideration

Enabling "TRUE LOAD BALANCING" for SEAs in dual VIOS setup

Currently in a dual virtual I/O server setup with SEA load sharing configured, each SEA is configured with more than one underlying virtual trunk Ethernet adapter. During the handshaking phase b/w the virtual I/O servers for establishing load shar...
over 8 years ago in PowerVM 7 Not under consideration

POWER firmware start policy should have an additional option (when Novalink, PowerVC used)

Add an option to the Firmware Start Policy settings in ASMI to include an option to only start Virtual I/O Servers AND Novalink on a regular power-on.For a recovery boot it should start NO partitions or ONLY VIOS, but certainly not Novalink and ce...
about 4 years ago in PowerVM 2 Future consideration

Move the functions handled by RMC between HMC and LPAR to the hypervisor.

Move the dlpar-related functions from the RMC connection to the PHYP. The OS/400 is already doing this (it has the functions, but doesn't talk to the RMC). Advantages:- No need for an RMC connection.- Can handle multiple tenants with the same IP r...
over 2 years ago in PowerVM 1 Future consideration

Need Maintenance mode switch for FW Update on SR-IOV cards

we have several SR_IOV config running wit SR_IOV native with NIB, vNIC Failover, SR-IOV VF for SEA etc.The problem we detected is that when doing a FW update for the SR-IOV cards we have either to do a lot of manual taks to switch to vNIC Failover...
over 4 years ago in PowerVM 1 Not under consideration