Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

My ideas

Showing 4481

be able to send authlog to an external server

We need authlog from the hmc sent to an external server (a clm for example) In the rsyslog config on the hmc, their is a config to send them to /var/hsc/log/secure : cat /etc/rsyslog.d/50-hmc-auth.conf => auth.* /var/hsc/log/secure & sto...
19 days ago in Hardware Management Console 0 Submitted

Provide an option with which the Prestart Job statistics can be reset in Navigator for i (Nav4i).

As more and more tasks can be performed using the Navigator for i and SQL services, the role of 5250 emulation is changing and having to go there for a missing option becomes a burden. The Navigator for i is great for managing prestart jobs, but w...
19 days ago in IBM i / Work Management and Messaging 0 Submitted

HMC should work as ntp server for eBMC ntp clients

As Pete Heyrman documented: The enterprise baseboard management controller (eBMC) was introduced in Power10 and provides similar system management functionality as the FSP. With respect to time, the eBMC time-of-day clock cannot be synced with the...
10 months ago in Hardware Management Console 2 Planned for future release

HMC automated installation

It's possible to have option for fully automated installation physical HMC and virtual HMC ? This is time consuming in case IBM support request as part of solution reinstallation of HMC code and restore configuration from backup. It will simplify ...
5 months ago in Hardware Management Console 1 Planned for future release

Linear Tape File Sistem (LTFS) support on IBM i

LTFS is a common LTO tape format for offline archive across multiple platforms. It would be valuable for system adminstrators/operators if IBM i platform could also supports LTFS formatted LTO tape cartridge.
about 1 month ago in IBM i / System Management 0 Submitted

Capacity/Performance Management

HMC should provide the same detail level and functionality like lpar2rrd in point of Capacity and Performance management.
7 months ago in Hardware Management Console 2 Future consideration

Add Inherit Rules to IFS journalling

Today when you set up journalling for the IFS the STRJRN command allows you to filter the objects that are to be journalled, however this is a one off request and the inherit rules are not able to be set to allow future filtering of the objects jo...
3 months ago in IBM i / IFS (Integrated File System) and Servers 1 Future consideration

Provide Prometheus exporter for LPAR and System data in HMC

Please provide a Prometheus exporter for the HMC which cound be used for sending system and partition utilization data to prometheus timeseries database. This would be very helpful to consolidate performance data in a single place together with ot...
9 months ago in Hardware Management Console 1 Planned for future release

If there is an application monitor installed e. g. that runs every 5 minutes it doesn't reflect the status to the clavan.log.

If there is an application monitor installed e. g. that runs every 5 minutes it doesn't reflect the status to the clavan.log. So, if there are no log entries the clavan cmd says "clavan: Not able to analyze application availability because both th...
about 1 month ago in PowerHA for AIX 1 Submitted

Named index of current iteration in for-each loop

I'm building some functionality that relies on several arrays that need to be filled, checked and modified on the fly. I like the for-each loop with dim(*auto: nn) for this. In the initial load proces I can use '*next' as an index, which is great....
4 months ago in IBM i / Languages - RPG 1 Future consideration