Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 225

Consolided Capacity monitoring view

In Capacity Monitoring/Performances page, CPU installed, Available, Allocated, Actived can only be shown in each Power view not in the main page (only core usage and cores available). To have a consolided view (with csv export) could be usefull fo...
9 months ago in Cloud Management Console 0 Submitted

Same behavior for chsyscfg as for chhwres

It should be possible to set parameters individually with the command "chsyscfg" for the vnic adapters.In the GUI also only the parameters I modify are adjusted.The "default" values should only be used when creating a new profile.
about 1 year ago in Hardware Management Console 0 Submitted

Improve the lrud behavior when free the large amount of memory.

When lrud free the memory, it will enable the interrupt disabled mode and block other threads. When customer runs the time-sensitive applications, it might lead to an application time out and then the transaction failures.
10 months ago in AIX 0 Submitted

Expand UpgradeLV

HMC was on V10R1M1020 and we wanted to upgrade it to R2M1030. saveupgdata -r disk failed because of not enough space on UpgradeLV. We have 22 managed systems on one HMC and many users on the HMC. None of the users has anything large in home direct...
over 1 year ago in Hardware Management Console 0 Submitted

RFE for Apple about AIX Live Kernel Update preview phase checking for available storage and avaiable network IPs

Currently AIX Live Kernel update may fail due to lack of storage (Apple case TS013523804 ) or lack of available IPs (Apple case TS013523634 ). Apple contact asked, for both of these conditions that may cause LKU to fail, is this something that can...
10 months ago in PowerVC 0 Submitted

New IBM i Service for NetServer

I would like an IBM i service to see all the IBM i NetServer configuration
11 months ago in IBM i / System Management 2 Submitted

Power Supply "AC resume" message enhancement for P7/8/9 CEC and IO Drawer

Existing P7/8/9 do not have power supply resume message from HMC. and the AC loss message are only prompt once. Customer do have not any methodology to remote monitor if the CEC / IOC power supply status except go into the data-center to check the...
almost 6 years ago in Hardware Management Console 2 Submitted

ACS: Improve user experience by using better button texts

When the user get's an error message that needs to be confirmed try to provide the dialog in such a way that the user does not need to read the error message but can infer the action from the button text. See attachments.
11 months ago in IBM i / Application Development 2 Submitted

Graphic tool or sql service to know the percentage of use of the tapes.

Currently there is no tool or any sql service that helps to know the percentage of use/free is a tape device. For now there is only this old method to calculate it. https://www.ibm.com/support/pages/how-much-data-and-how-much-free-space-available-...
12 months ago in IBM i / Save and Restore 2 Submitted

Support additional memory on 4-core server models. 128GB or even 256GB.

Over time POWER processors have gained capability. From 4,200 CPW on a POWER6 to over 20,000 CPW on today's Power10. When POWER7 was introduced the CPU went from 4,200 CPW per core to 6,000 per core AND supported memory on low end servers went f...
over 1 year ago in IBM i / Hardware 1 Submitted