Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Performance Tools

Showing 21 of 4472

CGI PDI Enable History Performance Reports PDF

Inavigator PDI Performance Data Investigator.Create Report of History Performance data , and preferably to be able to schedule them. Use Case: PM400 is End Of Support by IBM , There is an high demand from our IBM i customers to have similar monthl...
almost 4 years ago in IBM i / Performance Tools 7 Future consideration

Add ability to generate performance graph data from R720 Collection Services data in Navigator for i

Since PM for Power is being discontinued on September 30, 2020, clients need a way to view graphed performance data for all supported releases. Links to external letters for different geographies with the discontinuance statement:IBM Americas - Un...
over 4 years ago in IBM i / Performance Tools 3 Not under consideration

Performance Cycling at 12:00 AM on multiple Lpars cause CMC Enterprise core usage to peak lasting 800 microseconds giving very high average core usage

Let.s say you have purchased IBM CMC Enterprise Pools2.0 concept, and you have license for 10 core and 1 core credit. Your average per minute usage is between 6-7 core all day. But a 12:00 AM when performance collection is cycled on all your ibm i...
almost 2 years ago in IBM i / Performance Tools 1 Submitted

Extend call stack entries in PEX file QAYPEIAD

To analyze heap issues on ILE C++ applications we use IBM i PEX with Event *ACTGRPHEAP. The current outfile QAYPEIAD have fields for a call stack up to 16 entries. This is maybe enough for C programs but for C++ programs with a lot of functions an...
5 months ago in IBM i / Performance Tools 0 Submitted

Improve support in PDI Job Watcher for Jobs that do not use CPU during the interval

By design, the Job Watcher performance data collector does not collect data on jobs that do not use CPU during the interval. Jobs that are blocked by waits such as a database record lock or an object lock are often in a long wait and do not use CP...
3 months ago in IBM i / Performance Tools 0 Submitted

Improve the performance of PDI Job Watcher Interval Details

When investigating Job Watcher data, Interval Details allows you to get to call stacks and SQL statements. However, it takes a very long time for interval details to display - upwards of a minute or more; it is so slow as to be nearly unusable. Th...
3 months ago in IBM i / Performance Tools 0 Submitted

Enhance PDI to have the option to open drill-downs in new tab

In New Navigator, the Performance Data Investigator supports opening the initial chart in a new tab. However, all drill downs taken on that chart open in the same tab. This is problematic for the following reasons: I often need to look at mulitple...
3 months ago in IBM i / Performance Tools 1 Future consideration

Expand metrics visualized by Graph History

Graph History has a defined list of metrics that you can visualize. However, the historical data collected on the system includes many more metrics than are visualized. This RFE is to request additional metrics be added to the graph history metric...
over 3 years ago in IBM i / Performance Tools 2 Future consideration

Allow PDI reporting to be scheduled.

Each month I need to present the same charts to several customers.It would be great if reporting could be scheduled for PDI so charts get created and sent by email.Thanks!!! Use Case: Performance and Capacity planning.
over 6 years ago in IBM i / Performance Tools 2 Future consideration

Expand the temporary storage metrics in the QAPMSYSTEM file to track each global bucket

The QAPMSYSTEM file in Collection Services has information about system-wide use of temporary storage - but this is grouped into database, non-database, active jobs, and ended jobs. It would be extremely helpful to expand this temporary storage tr...
about 3 years ago in IBM i / Performance Tools 1 Future consideration