Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

RDi (Rational Developer for i)

Showing 600

Allow "Refactor" to rename the record format named on the SFILE() keyword in a dcl-f statement.

When refactoring record format names in a display file, I noticed that using the Refactor action on the record format name works fine everywhere BUT the file specification that references the record format name on a SFILE() keyword. I have to reme...
7 months ago in IBM i / RDi (Rational Developer for i) 3 Future consideration

Code Coverage Consolidation with multiple cczip files on same object not working in RDi9.8

In RDi 9.8, When executing multiple test cases on different procedures in a module or on a program, different cczip files are created. We use below approach to consolidate them and generate the final code coverage. However, it doesn't consolidate ...
5 months ago in IBM i / RDi (Rational Developer for i) 2 Future consideration

Auto refresh Service Entry Points in RDi

When setting a Service Entry Point in RDi, every time you re-compile the program the SEP must be refreshed. It's easy to forget to do so, and then you need to stop the program you are trying to debug. It would be good if RDi would just auto refres...
over 5 years ago in IBM i / RDi (Rational Developer for i) 5 Future consideration

Enhance Remote Reconciler so that multiple source members can be pulled at once

Today the Remote Reconciler does not allow selecting multiple source members for being pulled to the PC. Option "Pull from" is greyed out if multiple members are selected. In case there are several new source members on the host, the members can o...
3 months ago in IBM i / RDi (Rational Developer for i) 1 Future consideration

SQL1103 in Error List for QTEMP tables

On a compile, the Error List shows SQL1103 (Column definitions for table &1 in QTEMP not found) for QTEMP tables that don't exist in the RDi job. Those messages are irrelevant and can cause pertinent warnings to be missed. RDi should suppress ...
7 months ago in IBM i / RDi (Rational Developer for i) 1 Future consideration

RDi Library List View Enhancements

a) Library List Connections dropdown should be ordered with the active connections first, not Alphabetical orderb) Clicking on an inactive connection should not automatically attempt to connect - an action should be required firstc) The Library Li...
over 4 years ago in IBM i / RDi (Rational Developer for i) 5 Future consideration

Add keyboard shortcut: Navigate to next/previous DCL-PROC statement (bonus: position the DCL-PROC to top of window)

Example: In a module with 50 procedures being able to quickly bring the next or previous procedure to line 1 would be a time save. For those who flip monitors to a portrait view this would be more beneficial. Extending this behavior to BEGSR state...
10 months ago in IBM i / RDi (Rational Developer for i) 1 Future consideration

Import existing user defined options into PDM perspective

We are relatively new to RDi and have a lot of user defined options coded for the green screen version of PDM. RDi does have a PDM perspective but there is no way to bring in the pre-existing options already defined in the green screen PDM. Need t...
over 1 year ago in IBM i / RDi (Rational Developer for i) 2 Future consideration

Do not change the date field in date area if only change for a source line is a "white space" change.

Do not change the date field in date area if only change for a source line is a "white space" change.Or a setting where you can control the date field in date area being updated on a source line "White space only" change. An example of this is RPG...
almost 9 years ago in IBM i / RDi (Rational Developer for i) 8 Future consideration

Include select/omit criteria for logical files in outline view

Files used in RPG can be logical files that include select/omit criteria. In order to know what those are, I need to go elsewhere, such as DSPFD in a 5250 session. As of this date, the select/omit specification is not visible in the Schemas action...
almost 6 years ago in IBM i / RDi (Rational Developer for i) 6 Future consideration