Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 197

PEP 2.0 Delete Pool 2FA

Currently, a PEP 2.0 pool can be deleted with a single click of a button and an acknowledgement. I would suggest to add a 2FA (2nd factor authentication via email etc) before any pool can be deleted to eliminate the chance of a mistake.
about 1 year ago in Cloud Management Console 0 Submitted

Need to see percentage of AIX,VIOS,SLES,RH in overview Cores/Memory in hours/Days etc

In EP 2.0 overwiew Core Usage Total usage (In Average) and Memory Usage Total Usage (Average TB) for hours,days etc. i want to see the percentage of each section e.g. AIX,VIOS,SLES;RH ) see also attached graphic
about 1 year ago in Cloud Management Console 0 Submitted

Telnet Server Attributes for V7R4

Currently there is no API to get telnet server attributes or SQL services in V7R4.The use case for this is for system parmeters docummentation. https://www.ibm.com/support/pages/node/1119123
11 months ago in IBM i / Networking 0 Submitted

Change view e permissione for role "VIEWER"

We operate as an ICP for several of our Power Systems client. As we explore the different cloud users' roles in PowerVC, we realize the Viewer user role is the one that fits as the most except for one thing. It is missing the 'resource usage' view...
6 months ago in PowerVC 0 Submitted

Add lpar status to IBM Safe Guarded Copy screen

IBM Safe Guarded Copy (SGC) See attached WRKSGCPY screen Before we try to recover to a SGC, or before we try to end recovery, we need to know that the recovery lpar is powered off. Add some function to the WRKSGCPY screen to see that.
12 months ago in IBM i / Other 0 Submitted

updateios breaks the update due to network disruption

You can reach out Deepak Menezes(deepakme@in.ibm.com) .This is with respect to issue we hit on case TS011570960Was installing Fix Pack 3.1.4.10 on top of his system 3.1.3.14.During the installation the Putty session disconnected due to network dis...
almost 2 years ago in PowerVM VIOS 0 Submitted

Graphic tool or sql service to know the percentage of use of the tapes.

Currently there is no tool or any sql service that helps to know the percentage of use/free is a tape device. For now there is only this old method to calculate it. https://www.ibm.com/support/pages/how-much-data-and-how-much-free-space-available-...
over 1 year ago in IBM i / Save and Restore 2 Submitted

PDU cables shorter than 4.3M for in-rack connections

The PDU cable (ex. #6654) is currently only length of 4.3M, although PDU are connected any components in a rack in most cases.The PDU cable is too long and become a big cable roll under the rack. And these big cable rolls are as many as PDUs.Pleas...
12 months ago in Power Systems Design 1 Submitted

Power Supply "AC resume" message enhancement for P7/8/9 CEC and IO Drawer

Existing P7/8/9 do not have power supply resume message from HMC. and the AC loss message are only prompt once. Customer do have not any methodology to remote monitor if the CEC / IOC power supply status except go into the data-center to check the...
over 6 years ago in Hardware Management Console 2 Submitted

Command to fetch VPD

Recently, after server firmware update, when the server was power cycled, it didn't came back up and the support team asked to upload the dumps from HMC. It was a production server and the timeline was very tight. So, now the client wants to get t...
about 1 year ago in Hardware Management Console 0 Submitted