Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 206

Power Supply "AC resume" message enhancement for P7/8/9 CEC and IO Drawer

Existing P7/8/9 do not have power supply resume message from HMC. and the AC loss message are only prompt once. Customer do have not any methodology to remote monitor if the CEC / IOC power supply status except go into the data-center to check the...
about 6 years ago in Hardware Management Console 2 Submitted

Enhance lsmpio showing both storages in an policy-based HA environment (mirroring)

In an AIX VM using a FS9500 environment with policy-based HA it is only possible with lsmpio to see the primary storage node of the mirroring relation in the FS9500. It should be possible to see both storages of that relation. This is especially i...
about 1 month ago in AIX 0 Submitted

Change of WLM start/restart behave in passive mode

When restart or start Workload Manager WLM the AIX is set internal locks to be shure that no new porcess,fork etc can happen until AIX has checked all running processes again WLM rules. On a multi terrabyte memory machine this can lead to 5-7 minu...
4 months ago in AIX 0 Submitted

Performance Cycling at 12:00 AM on multiple Lpars cause CMC Enterprise core usage to peak lasting 800 microseconds giving very high average core usage

Let.s say you have purchased IBM CMC Enterprise Pools2.0 concept, and you have license for 10 core and 1 core credit. Your average per minute usage is between 6-7 core all day. But a 12:00 AM when performance collection is cycled on all your ibm i...
over 1 year ago in IBM i / Performance Tools 1 Submitted

For AJS, the notification message setting item cannot be set for double-byte characters.

This is an event when adding a job in AJS on the 5250 screen.The Notification Message item is set to type A, and double-byte characters cannot be set.Double-byte character input is important in Japanese environment. Please let us know how to solve...
about 1 month ago in IBM i / System Management 1 Submitted

SRCSTMF parameter for CRTDSPF

As we are using more and more modern ways and tools to develop our software, it really hurts that one has to copy DDS sources to a member in a temporary source physical file in order to be able to create a display file. I’m pretty sure that it wou...
3 months ago in IBM i / Application Development 2 Submitted

Provide RSCT Domain filtering options for managed systems co-managed by HMC and PowerVM NovaLink

In PowerVC environments that utilize IBM Cloud Management Console (CMC) for Power Enterprise Pools (PEP), it's common for managed systems to be co-managed by HMC and PowerVM NovaLink. PowerVM NovaLink is in controller mode to facilitate operations...
4 months ago in Hardware Management Console 1 Submitted

Additions for the PRUV tool

Please add the following to the PRUV tool. Report on command default changes in IBM licensed program libraries. simple example (SELECT * FROM TABLE(QSYS2.OBJECT_STATISTICS('*ALL', '*CMD')) > WHERE APAR_ID = 'CHGDFT';) possible enhancements: in ...
7 months ago in IBM i / Install and Upgrade and Licensing 0 Submitted

Selection the length of server power cables

The #6577 is described on the below manual that manufacturing select length when a rack is configured in the factory. https://www.ibm.com/docs/en/power10?topic=pr-supported-power-cordsCustomer said that in spite of the connection for servers to PD...
8 months ago in Power Systems Design 0 Submitted

PDU cables shorter than 4.3M

The PDU cable (ex. #6654) is currently only length of 4.3M.The PDU cable is too long and become a big cable roll under the rack. And these big cable rolls are as many as PDUs.Please provide PDU cables shorter than 4.3M including the perspective of...
8 months ago in Power Systems Design 0 Submitted