Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 4468

File journals

When upgrading from V6R1 to V7R1 we are no longer able to associate journal receivers with the journal after making file changes. We never had an issue until the upgrade to V7R1 and we have made numerous file changes without issues on V6R1. Techni...
over 7 years ago in IBM i / Db2 for i 3 Not under consideration

mkps and chps can create > 64GB paging spaces

The swap man page says paging devices can be a maximum of 64GB. Yet mkps and chps can create a device of any size. The customer in this referenced pmr changed his paging device from 24GB to 150GB and it did not swap on when he rebooted. He deleted...
over 7 years ago in AIX 1 Not under consideration

IDS 12.10 syspurge enhancement

We are experiencing locking errors during IBM Informix Dynamic Server syspurge causing a failure to complete syspurge specifically with tables using interval fragmentation. We understand that currently IBM cannot guarantee that there will not be c...
almost 4 years ago in AIX 1 Not under consideration

Ability to disable updates to the file access times in IFS (noatime support)

Add the noatime attribute to the mount command for UDFS objects. Use Case: When accessing hundreds or thousands of unchanging files in IFS, for example when compiling a large application, it would be useful to stop updating the access time for eac...
over 7 years ago in IBM i / IFS (Integrated File System) and Servers 5 Not under consideration

AIX: add robust mutex capability to pthreads

IBM Power Systems customer Bloomberg is requesting AIX support the robust mutex capability as described in the below link: http://pubs.opengroup.org/onlinepubs/9699919799/functions/pthread_mutexattr_getrobust.html
over 7 years ago in AIX 1 Not under consideration

Add cli_chgrpmem command in order to add/remove 1,000+ users to/from a group

The current PowerHA release does not allow to add a group with 1000+ ID (verified with 1023 and 1246 IDs): doing so, CSPOC produces "Command is too long" error. Increasing CSPOC internal buffer to 32K does not help (debug iFix "dbg40041_a" was tes...
almost 4 years ago in PowerHA for AIX 1 Future consideration

Into some smitty meny, pressing Enter without making any change, the cluster doesn't advise that a sync is required

Pressing ENTER into the RG configuration menu without change any field, cluster modify anyway some info into the ACD, but it's doesn't inform the client that a synchronization is required. Client expected to receive the same information message th...
over 7 years ago in PowerHA for AIX 0 Planned for future release

lpex outline with many views

RDP(Version: 8.5.1)Using the outline view in the lpex editor. Use Case: If I in RDP(Version: 8.5.1) use the outline view in a secondary view of the source code in the lpex editor and click on some line in it,it alvays position in the source code i...
over 11 years ago in IBM i / RDi (Rational Developer for i) 2 Is a defect

pre-check of LS fragmentation

with regards to archive PMR 26573,110,846 we would like to suggest to have load source fragmentation level checked as part of GO LICPGM/Prepare for Install/Allocate additional space for LIC (and in IBM pre-upgrade verification tool for IBM i) Use ...
over 7 years ago in IBM i / Install and Upgrade and Licensing 1 Not under consideration

Save and restore Object Table columns

The Object Table has an option to "Re-open to previous state" that usually remembers the CONTENT of the table and restores it the next time RDi is started. It would be really nice if it would also remember the column widths and restore those too. ...
over 7 years ago in IBM i / RDi (Rational Developer for i) 2 Future consideration