Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

All ideas

Showing 4617

Emulex Dirver Support for the Emulex SAN Manager

Support for Congestion Management, Visibility of Transceiver Data and Inventory of all Power Emulex HBAs. Customers can do autonomous Congestions Managment who can help them mitigate Performance Problems. With the Visibility of Transceiver Data th...
over 2 years ago in AIX 0 Under review

BRMS Media policy retention period limit

The maximum retention period in BRMS media policy is 9999 days now. However, there are some business required to keep the backup record for 30 years which we can only set the retention period as *PERM and review the retention period time by time. ...
about 1 month ago in IBM i / BRMS 1 Future consideration

add feature to predict if "verification + synchronisation" will bring resource group(s) down of not

When you make a change to the powerHA configuration on one node you have to run "Verify and Synchronize Cluster Configuration" to propagate the change to the other nodes. When you do that the smit panels will give you the following warning: "Depen...
about 1 year ago in PowerHA for AIX 0 Future consideration

HMC GUI Darkmode

see screenshot
10 months ago in Hardware Management Console 0 Future consideration

Enabling FDMI hostname visibility for NPIV

FDMI is most commonly used for hostname visibility from SAN ports. This visibility can be used for checking the hostname from SAN and for automation of SAN provisioning with end to end processes. Currently only physical HBA on AIX can provide FDMI...
about 1 year ago in AIX 1 Future consideration

Better behavior and error handling between Infoprint and SMTP

We've gone to great lengths to troubleshoot an email delivery issue in IBM Case TS015919455. When encountering a transient email delivery issue while using a 3rd party email relay server on the public internet (i.e. Microsoft 365), the IBM SMTP se...
10 months ago in IBM i / Print 2 Future consideration

Selection the length of server power cables

The #6577 is described on the below manual that manufacturing select length when a rack is configured in the factory.https://www.ibm.com/docs/en/power10?topic=pr-supported-power-cordsCustomer said that in spite of the connection for servers to PDU...
over 1 year ago in Power Systems Design 0 Under review

PDU cables shorter than 4.3M

The PDU cable (ex. #6654) is currently only length of 4.3M.The PDU cable is too long and become a big cable roll under the rack. And these big cable rolls are as many as PDUs.Please provide PDU cables shorter than 4.3M including the perspective of...
over 1 year ago in Power Systems Design 0 Under review

Make installing Visual Explain optional

When installing IBM i Access Client Solutions (ACS) the option is given to skip the installation of several components. Run SQL Scripts (RSS) always has Visual Explain included. I would like to see this treated similar as the System Debugger which...
10 months ago in IBM i / IBM i Access Family 2 Not under consideration

IBM PowerSC should provide an option to mark a failed compliance rule as exception in the GUI

The IBM PowerSC Compliance Automation feature allows users to run compliance check. Once the check is complete, the GUI shows the result and displays the failed rules. If at least 1 rule has failed then the compliance status of the LPAR is shown a...
10 months ago in PowerSC 2 Planned for future release