Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Save and Restore

Showing 22

Add new parameter SAVDTA( *YES | *NO ) to the SAVLIB and SAVOBJ commands.

It would offer the ability to save a library (or object) without data so that a new instance of an application could be created starting with an empty database. Everything would be saved except the data. When the library is later restored tables a...
8 months ago in IBM i / Save and Restore 4 Future consideration

SAVSYS show progress

Some customers use an USB thumb drive to run a SAVSYS on a monthly base. With slow USB sticks this process needs 15+ minutes without any progress display. Some customers are curious if it is still working. Use Case: show progress on save to avoid ...
over 3 years ago in IBM i / Save and Restore 5 Future consideration

early progress display on SAV big objects from IFS

When saving large objects from IFS (e.g. image catalogs) to save file or tape device, the progress messages (number of objects or size) will be shown after the first 500 objects. If the save operation only contains 100 (big) objects, the progress ...
over 2 years ago in IBM i / Save and Restore 2 Future consideration

Improve RSTAUT output and log

When restoring authorities it is often the case some cannot be restored. Checking exactly what hasn't been restored, is very time consuming. The RSTAUT command has no option for output to spool or file. The command should present the option to out...
over 5 years ago in IBM i / Save and Restore 7 Future consideration

Allow change of Unload at Vary Off for Tape Device Description whilst active

The default value for the "Unload device at vary off" parameter on a tape device description is *YES Currently, it is not possible to change this value to *NO without varying off the device description, which of course ejects the tape. I would lik...
over 3 years ago in IBM i / Save and Restore 5 Future consideration

Enable restoring last used date from save media rather than setting it to the restore date.

When a customer moves between systems, say Power9 to Power10 using the standard tape Save/Restore every object on the system gets stamped with the last used date of the restore. This becomes a problem when the customer starts reviewing things to f...
about 1 year ago in IBM i / Save and Restore 2 Future consideration

GO SAVE 21,22,23 display improvement

GO SAVE options 20 and 21 display a screen to enter the tape device, etc. I believe option 22 uses the same screen. It appears all 3 options use the same display. Please display on that screen the actual option / option description chosen on the m...
about 3 years ago in IBM i / Save and Restore 2 Future consideration

Enable group profiles in SVRAUTE's to support ObjectConnect over TCPIP

ObjectConnect was recently upgraded to permit *IP transport. However, the current implementation requires a direct match to a user ID in the Server Authentication Entries; where a Group Profile permits more generic, and flexible, support. Please p...
11 months ago in IBM i / Save and Restore 2 Future consideration

Save 21 / Restore 21 End Option for Tape (*unload, *rewind *Leave)

Add an option to allow the selection to the Go Save menu Option 21 Entire System Save and Go Restore 21 Entire System Restore To add the ability to select the tape media End Option e.g. *unload, *rewind *Leave Use Case: This is particularly useful...
over 5 years ago in IBM i / Save and Restore 4 Future consideration

increase speed on DUPTAP and DUPMEDBRM positioning

Increase positioning speed during DUPTAP / DUPMEDBRM or change behavior of how it is done.Currently on each duplication operation the cartridge is rewound and drive reads from beginning every sequence until it reaches the desired seq. number to be...
over 6 years ago in IBM i / Save and Restore 10 Future consideration