Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Power Systems Design

Showing 31 of 4497
147 VOTE

Concurrent Maintenance for Ethernet adapter component SFP - FRU for SFP request

Please provide concurrent maintenance using own FRU = Field Replaceable Unit number for adapter component SFP for ethernet adapter EN0J, EL38, EN0H, EL56, CCIN for all is 2B93, vendor Emulex / Broadcom. Currently a FRU number is available for whol...
over 4 years ago in Power Systems Design 7 Not under consideration

Improve time to get Full Sysdump in Highend Mission critical systems with huge amount of memory

As IBM we describe Highend Power servers as one of the most resilient and available platforms to hold mission critical workloads. Those servers have increasing amount of memory (several TB) and hold many workloads in parallel thanks to our PowerVM...
7 months ago in Power Systems Design 0 Planned for future release

Selection the length of server power cables

The #6577 is described on the below manual that manufacturing select length when a rack is configured in the factory.https://www.ibm.com/docs/en/power10?topic=pr-supported-power-cordsCustomer said that in spite of the connection for servers to PDU...
about 1 year ago in Power Systems Design 0 Under review

PDU cables shorter than 4.3M

The PDU cable (ex. #6654) is currently only length of 4.3M.The PDU cable is too long and become a big cable roll under the rack. And these big cable rolls are as many as PDUs.Please provide PDU cables shorter than 4.3M including the perspective of...
about 1 year ago in Power Systems Design 0 Under review

InfiniBand adapters for Power10 based hardware

Customers are asking for a higher performance networking option than is currently available from the existing RoCE-capable 100 Gbps Ethernet adapters on Power10 based server models. Based on the performance seen with POWER9 based servers, they exp...
about 2 years ago in Power Systems Design 3 Not under consideration

Request for a function to allow user to specify the number of sockets DPO(Dynamic Platform Optimizer) should consolidate an LPAR into instead of spreading out across all 4 sockets for large LPARs

We have optimized Power E1080 CPU/Memory affinity, try to consolidate each LPARs into 2 sockets, but failed. How to do it now? IBM responsible engineer feedback the following info.: The DPO (Dynamic Platform Optimizer) has a built-in algorithm whi...
8 months ago in Power Systems Design 1 Future consideration

Concurrent replacement for the FSP

The FSP (Flexible Service Processor) cannot be changed in Concurrent mode. The E870C and E880C Systems have a dual FSP configuration, the failover of a FSP System does not create an outage.But the replacement of the failed FSP must be done after o...
over 6 years ago in Power Systems Design 3 Not under consideration

Primeval Quantum C.P.U Desk Top Device's, With 5D Data Storage Ultra Inferred Laser Imprint Information Superman Theory with up to 500 Terabytes

Eccentric Process Unit Of Information To Process into Quantum, Computing For Home Desk Top Use, Stem cells growing into the Network of the Primeval with (AI), laser imprinted Primeval Brian on A Chip (C.P.U), C.P.U-Primeval, is made of (Cadmium &a...
5 months ago in Power Systems Design 0 Submitted

Get Elastic Capacity on Demand CoD code via an api call.

This is the only missing step to a larger automation idea to automatically allocate Elastic Capacity on Demand to a LPAR with a shell script. I have solved adding a CoD code to a frame and activating the resource and adding it to a LPAR through th...
about 1 year ago in Power Systems Design 0 Submitted

AC922 - BMC-GUI usable in HMC-GUI

make usage of BMC-GUI possible like we know from cassical-FSP Power-machines ( ASMI )
almost 4 years ago in Power Systems Design 0 Not under consideration