Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Power Systems Design

Showing 29 of 4263

InfiniBand adapters for Power10 based hardware

Customers are asking for a higher performance networking option than is currently available from the existing RoCE-capable 100 Gbps Ethernet adapters on Power10 based server models. Based on the performance seen with POWER9 based servers, they exp...
over 1 year ago in Power Systems Design 3 Not under consideration

Finally leverage "the mainframe lesson" and fully exploit NUMA in POWERsystems

Why run VIO servers in the same cores, DIMMs, buses, etc. as all your real workloads? Instead of a 2-socket / 2 NUMA domain system, sell us an asymmetric 4-socket / 4 NUMA domain system where 2 of the sockets / domains are much smaller and contain...
over 1 year ago in Power Systems Design 3 Not under consideration

Support direct attached fibre tape - power 10

Many existing Power customers have direct attached fibre tape drives/libraries and VTL’s. Not having a supported adapter, on scale out p10, is a big problem. Requiring a fibre switch is both cost prohibitive and creates a support issue (no in-hous...
over 1 year ago in Power Systems Design 1 Future consideration

Adding AI in Edge Computing based on Intel IPU and Nvidia DPU based on 5G Networking

1- Enabling AI in Edge Computing using the 5G Slicing Networks 2- Writing Device Driver for Intel IPU and Nvidia DPU devices to enable the IBM i and Linux accessing these devices. 3- Enabling the NVMe over TCP/IP for accessing devices over 5G netw...
almost 2 years ago in Power Systems Design 3 Not under consideration

On Power 10 with IBM i fc5899 natively supported or must go through VIOS?

Do I have to use VIOS in order to use the FC 5899 on Power 1024 on an IBM i partition.
almost 2 years ago in Power Systems Design 1 Functionality already exists

Support for native tape attach on Power 10

Are customers now forced to purchase a switch to attach lto tape libraries to Power 10?
almost 2 years ago in Power Systems Design 1 Future consideration

24TB memory option for future Mid-Range server

For SAP HANA customers, there are a number of requests for hardware instances to support 24TB databases. Our biggest competitor here is HPE with their Super Flex offering, and currently the E1080 option is not competitive in RFP responses. So a 24...
almost 2 years ago in Power Systems Design 1 Not under consideration

Add a expansion piece to the rails

When you are installing a HMC, Power 9 etc, in a non IBM rack, sometimes the HMC is just an half an inch too short from side to side. This happens when you are installing the hardware in a datacenter that you have no control over the rack. The onl...
almost 2 years ago in Power Systems Design 0 Under review

Evaluate if Nutanix on Power Systems is valid (again) with new workloads

Nutainx runs quite many areas inside companies, like VDI but also databases and plain app-vms. In this scenario also offering Power Systems as HW nodes might make the usage of Power Systems easier for customers to implement/use for Linux and AIX.
almost 2 years ago in Power Systems Design 1 Not under consideration

AC922 - BMC-GUI usable in HMC-GUI

make usage of BMC-GUI possible like we know from cassical-FSP Power-machines ( ASMI )
about 3 years ago in Power Systems Design 0 Not under consideration