Skip to Main Content
IBM Power Ideas Portal


This portal is to open public enhancement requests against IBM Power Systems products, including IBM i. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Hardware Management Console

Showing 348

HMC Enhanced UI lacking client slot ID option for vSCSI adapters

The enhanced UI in the HMC is lacking the ability to choose a slot id for the client vSCSI adapter and forces the next available slot id on the client LPAR which may vary from LPAR to LPAR. This is not the case with the classic UI where you have f...
about 6 years ago in Hardware Management Console 1 Not under consideration

Add OS version compatibility to LPM verification check process

LPM passed verification, LPAR successfully migrated, however, the OS version running in the LPAR was AIX 5.3, which is not supported on the target frame ( Power8 E870). Partition was non-functional, and had to be manually recovered back to the sou...
about 6 years ago in Hardware Management Console 2 Not under consideration

Add an EKM server to HMC

In order to use hardware tape encryption with our IBM i servers, we need to have a set of servers configured with an EKM product (SKLM, formerly TKLM) to manage the keys. It would be nice of the HMC could have an integrated EKM server so we can ma...
about 6 years ago in Hardware Management Console 1 Not under consideration

HMC - PEP XML Preview

We use Power Enterprise Pools extensively. We have found that the XML provided by IBM after a resource purchase is not always correct and adversely affects our running POWER servers.
about 6 years ago in Hardware Management Console 2 Future consideration

VMWare TOOLS HMC

We need the vm TOOLS in HMC appliance to shutdown guest on VCenter and compatibility to work with Backup Systems.
about 6 years ago in Hardware Management Console 3 Not under consideration

Require MIB file for HMC

Hardware PMR #P491XWJ, They are directed to raise request here. We have configured in HMCs to send all the traps to 2 SNMP Monitoring CA Servers to monitor the alerts by Command Centre. Then, They will create Incident to Unix team and inform accor...
about 6 years ago in Hardware Management Console 4 Not under consideration

IT department : Jose Carlos Alves

we need to change the MTU from 1500 to 1450 in our DR HMC ( external network) and also this HMC is connect internally and locally to a p770 p7+ (FSP2) in DR site and also to a 2x E870 production servers in production site (FSP2 ports), my be we ne...
over 6 years ago in Hardware Management Console 1 Future consideration

support for multiple PCM Dashboard

remote and HMC session disconnects during ios restoration/migration which results in abnormal job termination thus delaying the project.
over 6 years ago in Hardware Management Console 3 Not under consideration

Dual HMC configuratrion with managed servers across two networked sites.

We have two HMC's in two separate sites. They managing the same managed systems as a dual-hmc configuration. The managed systems are also split across the two sites. Calls home for systems can be a challenge for support reps to correctly place the...
over 6 years ago in Hardware Management Console 1 Not under consideration

HMC offload

vHMC unable to offload problem data to USB.
over 6 years ago in Hardware Management Console 3 Planned for future release